Project Execution

From Contract Signing to Steel at the Port of Georgetown

Signing a contract with a manufacturer on the other side of the world is the start of a journey, not a leap of faith. This page shows that journey: the ten phases of a World Steel project, the gate that releases each one, what we need from you at every step, and how you can follow it in real time.

Tay Ninh, Vietnam Engineering · Fabrication · Shipping Destination: Guyana

One company from drawing to container

Steel structures fabricated per month
2,500 t
Our own factory in Tay Ninh (formerly Long An), Vietnam
Factory floor under one roof
20,000 m²+
Cutting, welding, blasting, painting and packing in one place
Projects delivered
300+
In Vietnam and more than 15 countries
Exporting to Guyana
Since 2020
Guyana Warehouse 1 & 2 delivered in 2022
IAS AC472 accredited, 2019
First in Asia
Certificate MB-268

Company figures and certificates as published by World Steel Group.

One accountable chain, under one roof

Integrated delivery

One accountable chain, under one roof

Many imported steel buildings pass through several hands: a designer in one place, a fabricator in another, a painter, a packer and a forwarder. Every hand-over is a chance for delay and for things to be lost.

At World Steel, engineering, procurement, fabrication, blasting and painting, inspection, packing and container loading all happen inside one company and one factory, coordinated by your project manager. You deal with one contract and one accountable team until your steel reaches the port.

Inside World Steel, for your project

  • Project Management Department: plan, reports and coordination
  • Technical Department: approval, shop and erection drawings
  • Procurement: steel from approved mills, with mill certificates
  • Factory: cutting, welding, blasting and painting
  • QA/QC: 7 inspection stages, hold points and the quality dossier
  • Business Department (Export): packing, loading and shipping documents

Performed directly by World Steel

Ten Phases

From contract to delivery, phase by phase

Each phase is released by a clear gate and ends with a record. The durations of your project are set in the baseline schedule agreed at kick-off.

  1. 01

    Contract signed

    Scope, specification, delivery terms, schedule and payment milestones are fixed in the contract.

    Technical highlight: Gate: contract signed and its first payment milestone met.

    Related documents: Contract, scope matrix

  2. 02

    Kick-off

    Your project manager is appointed and runs a video kick-off with you and your engineer: contacts, approval route, communication plan.

    Technical highlight: Baseline schedule agreed.

    Related documents: Kick-off minutes, baseline schedule

  3. 03

    Approval drawings

    The Technical Department issues the anchor bolt plan and approval drawings; questions are tracked in an RFI log.

    Technical highlight: Gate: your written approval releases procurement and production.

    Related documents: Approval drawings, RFI log

  4. 04

    Anchor bolts and foundation data

    Anchor bolt plan and column reactions go to your local engineer and contractor, so foundations can start in Guyana while the steel is being made.

    Technical highlight: Anchor bolts can be dispatched early where agreed.

    Related documents: Anchor bolt plan, reactions

  5. 05

    Procurement

    Plate, sections, coil, bolts and cladding are ordered to the approved bill of materials.

    Technical highlight: Mill certificates collected, heat numbers recorded.

    Related documents: Mill certificates

  6. 06

    Fabrication

    Members are cut, drilled, assembled and welded to the shop drawings, each with its piece mark and QR code.

    Technical highlight: Progress tracked live in World Steel Technology (BOM Studio).

    Related documents: Weekly progress report

  7. 07

    Inspection and release

    Inspections to the agreed Inspection and Test Plan, with hold and witness points; defects tagged HOLD and closed by NCR.

    Technical highlight: Gate: only released members go to packing.

    Related documents: ITP records, NCR log, MDR

  8. 08

    Packing and loading

    Members packed by erection sequence, bolts boxed by area, containers loaded to plan and photographed.

    Technical highlight: Gate: pre-shipment review of packing lists with you.

    Related documents: Packing lists, loading photos

  9. 09

    Shipping

    Containers sail with the carrier booked for your project, usually MSC or ZIM, under the agreed terms.

    Technical highlight: Shipping documents sent to you and your broker before arrival.

    Related documents: Bill of lading, invoice, certificate of origin

  10. 10

    Arrival in Georgetown

    Your customs broker clears the containers; your local contractor receives and erects with our drawings and remote support.

    Technical highlight: Close-out report and complete project record.

    Related documents: Erection drawings, close-out report

Decision gates

Four moments where the project only moves forward with a clear decision. They protect your schedule and your budget.

GateWhat releases itWho decides
Start of the scheduleContract signed and its first payment milestone metClient and World Steel
Release for productionApproval drawings approved in writingClient and engineer of record
Release for packingMember passed all inspections, no open NCRWorld Steel QA/QC, witnessed by you or your inspector if you wish
Release for shipmentPacking lists, loading plan and quality dossier reviewedClient and project manager

What we need from you, and when

Most delays in international projects come from decisions waiting on site. This list shows yours in advance.

WhatWhenWhy it matters
Engineer of record and local approval routeAt kick-offApprovals planned, not discovered
Comments on approval drawingsWithin the review period agreed in the scheduleProduction starts only from approved drawings
Colour and finish choicesBefore procurementPanels and paint are ordered to them
Inspection and witness preferencesBefore productionHold and witness points planned with you
Customs broker and consignee detailsBefore shipmentShipping documents issued correctly
Foundation readiness in GuyanaBefore arrivalSteel can be erected as soon as it is delivered
Local erection contractorBefore arrivalErection drawings and remote support planned with them

Real-time visibility

Follow every phase in real time

World Steel Technology (our BOM Studio platform) is free for World Steel clients and gives you the same view of your project that our team has.

Real-Time Production Reports

Progress by weight and by member, straight from the factory floor.

Production reports

Real-Time Quality Control

Hold, witness and review points, PASS/FAIL by QC and the NCR flow.

Quality control

Smart Erection

Free access for clients and local contractors, to plan and manage erection.

Smart Erection

Digital Handover

Every report and record in one package at the end of the project.

Digital handover

Who does what, from contract to delivery

World Steel manufactures in Vietnam and ships to the port of Georgetown. What happens in Guyana is done by the client or licensed local partners, with our documents and support.

ServiceWho performs itNotes
Project management, engineering and approval drawingsWorld SteelCoordinated with your engineer of record
Procurement, fabrication, coating and inspectionWorld SteelWorld Steel factory, Tay Ninh (formerly Long An), Vietnam
Packing, container loading and shipping documentsWorld SteelEvery container listed and photographed
Ocean freight to GeorgetownWorld SteelUnder CFR or CIF; under FOB the client books the freight
Third-party inspectionOptional / by agreementInspector appointed by the client, welcome at hold points
Local approvals and stamped drawingsLocal partner / clientLocally registered engineer where required
Customs clearance and inland transportLocal partner / clientClient's customs broker and logistics provider
Foundations and erectionLocal partner / clientLicensed local contractors using World Steel drawings

FAQ

Contract to delivery: questions

Straight answers on scope, design codes, shipping and what happens in Guyana.

Ask an engineer
When does my project schedule start?

From the date set in the contract, normally when the contract is signed and its first payment milestone is met. The baseline schedule agreed at kick-off shows every milestone from there.

What is the most common cause of delay?

Approval drawings waiting for comments. Production starts only from approved drawings, so a quick review on your side protects your delivery date. Your project manager will tell you exactly what needs your decision and by when.

Can foundations start before the steel arrives?

Yes. The anchor bolt plan and column reactions are issued early so your local engineer and contractor can prepare foundations while the steel is being fabricated. Anchor bolts can be dispatched early where agreed in the contract.

How do I know the steel is right before it ships?

Inspections follow the Inspection and Test Plan agreed with you, with hold and witness points you or your inspector can attend in person or by live video. Only released members are packed, and you review the packing lists before shipment.

Which shipping lines do you use?

Our regular carriers to Guyana are MSC and ZIM. Routes and transit times are explained on our shipping lines page.

What happens when the containers arrive?

Your customs broker clears them at the port of Georgetown and your local contractor erects the building with our erection drawings and remote support. We do not have an erection crew in Guyana.

Plan your project with us

Tell us your target date on site and where your project stands today. A World Steel project manager will reply with how we would plan it from contract to delivery.

Your details
Project information

We usually respond within two business days (Vietnam time, GMT+7). Your information is never sold or shared for marketing by third parties.

See the factory that would build your project

Book a live online audit and meet the team that would manage your project from contract to delivery.