Happy Diwali! Sun 8 Nov · holiday observed Mon 9 Nov · in 15 days May the Festival of Lights bring prosperity to every home and business in Guyana.
Manufactured in Vietnam · Exported to Guyana Guyana Calendar Info Client Portal dang.victor@worldsteelgroup.com WhatsApp

BOM Studio · On Site

Smart Erection: Traceability That Continues on Your Site

The record of every member does not stop at the port. With Smart Erection, your site team and erection contractor know which package and container each member is in, where it goes in the building, which step it belongs to and whether it has been inspected and accepted. You and World Steel follow the same progress, live. Smart Erection is free for every World Steel client and their local erection contractor.

BOM Studio Smart Erection dashboard

Screens

Smart Erection screens

Smart Erection dashboard

Erection dashboard

Tonnage produced, shipped, delivered, erected and accepted, open NCRs, missing members and the planned vs actual curve on one screen.

  • Physical component ID and QR ID for every member
  • Roles for client, site manager, supervisor and QC inspector

On Site

Site tools for your team

Free for your site team and your local erection contractor, with the permissions you agree.

Model navigation

Type or scan a mark and the model flies to its position: the member in orange, connected members in blue, with grid line, level, step, container and yard location.

Grids and zones

Positions in site language (G/13, A/1–3). Grids and levels come from the model; site coordinates are proposed and approved, never changed automatically.

Ready for Erection

For each step: what is missing, such as members not delivered, drawings awaiting approval, open NCRs or an unfinished earlier step.

Receiving and yard

Container arrival and seal check, package scanning, damage and shortages, and yard locations you can find from the passport.

Site inspections

11 inspection types, from grid position, level, plumb and bolting to field welding, temporary stability, anchor bolts and final acceptance, with NCRs and deadlines.

Drawing control

Drawings move from draft to approved, issued for construction, superseded and as-built. Members with an unapproved drawing are placed on DRAWING HOLD.

Client portal and share links

Invite members of your team by role and expiry, or share a link limited to the model, sequence, drawings, inspections or handover, with a PIN.

Site app, offline

Large buttons for scan, member, 3D, drawings, guide, progress, photo and issue. Works without a connection and synchronises without overwriting accepted data.

Responsibilities

Clear roles: who updates, who accepts

Progress buttons follow permissions: the installation supervisor records "in progress", "temporarily fixed" and "installed"; the QC inspector records pass or fail; acceptance is a separate step. The person who updates progress cannot accept their own work, and accepted data is never overwritten when two updates conflict.

Who does what in Guyana

  • World Steel: model, component IDs, packing in erection order, documents, free Smart Erection access and remote support
  • Your erection contractor: method statements, lifting, temporary stability and installation
  • Your QC inspector or engineer: site inspections and acceptance
  • Your site team: receiving, yard and progress updates

Requires a licensed local partner or the client's engineer in Guyana

FAQ

Smart Erection: questions

Straight answers on scope, design codes, shipping and what happens in Guyana.

Ask an engineer
Who on my side can use Smart Erection?

Your team and your local erection contractor, free of charge. You choose the people: for example your site manager, installation supervisor and QC inspector, each invited with a role and an expiry date. You can also share read-only links with a defined scope and a PIN.

Does it work without internet on site?

Yes. The site app can be downloaded for offline use and synchronises when the connection returns, without overwriting accepted data.

Does World Steel erect the building?

No. Erection in Guyana is carried out by the client or licensed local partners. World Steel provides the erection drawings, the sequence information in BOM Studio and remote technical support.

What if a member is missing or damaged?

Record it at receiving or as a site issue with photographs. It is checked against the packing list and loading photographs, and followed until it is closed.

Prepare Your Site with BOM Studio

Tell us about your project and your erection contractor. We will show you how they would use Smart Erection.

Your details
Project information

We usually respond within two business days (Vietnam time, GMT+7). Your information is never sold or shared for marketing by third parties.

More from BOM Studio

BOM Studio: World Steel Technology

World Steel's own project platform. Every steel member has an ID and QR code, and every step from production to handover is recorded, so you can follow your pr…

Read more

Real-Time Production Reports

Follow the fabrication of your building live: progress by steel weight for every stage, a coloured 3D model, factory photographs and weekly reports from a secu…

Read more

Real-Time Quality Control

Every inspection recorded as it happens: hold points, PASS / FAIL by a QC inspector, NCRs tracked to closure, welder qualifications checked by the system and f…

Read more

Packing, Containers & Shipping Documents

QR scan packing of QC-released members, checked container load plans, locked packing lists, a QR code on every package and a full report for every container.

Read more

Digital Handover

A complete, verifiable record of your building, generated from the project data and locked with a SHA-256 manifest.

Read more

Project Risk Control

The risks of an overseas steel project, from model errors to missing members on site, and how BOM Studio controls each one with a check, a rule and a record.

Read more

Become a World Steel Partner

For contractors in Guyana who want a reliable, long-term steel structure manufacturer: factory-direct supply, engineering support for bids, erection-ready deli…

Read more

Export Process & Packing Control

Every member inspected, marked, listed, packed, loaded and photographed: how World Steel makes sure your project in Guyana receives exactly what was designed, …

Read more

Shipping Lines & Transit Times: Vietnam to Guyana

The international shipping lines, routes and transshipment hubs that connect Vietnam with Georgetown, the weekly sailing rhythm, a realistic 45–60 day transit …

Read more