Happy Diwali! Sun 8 Nov · holiday observed Mon 9 Nov · in 15 days May the Festival of Lights bring prosperity to every home and business in Guyana.
Manufactured in Vietnam · Exported to Guyana Guyana Calendar Info Client Portal dang.victor@worldsteelgroup.com WhatsApp

World Steel Technology

BOM Studio: Your Steel Project, Live from Contract to Handover

BOM Studio is the platform World Steel built to manage steel structure projects worldwide, including Guyana. Every member of your building has its own ID and QR code, and every step from production to handover is recorded. You follow the same live data our team works with, free of charge for every World Steel client.

BOM Studio showing 4D BIM erection progress, with the weekly production report on a phone

One platform, one record, every member

ID and QR code per steel member
1
Created from the approved 3D model and used from the factory to the site
Production progress by steel tonnage
Live
Updated as soon as the factory confirms a step
Locked released documents
SHA-256
Released packing lists and handover packages cannot be changed silently
For every World Steel client
Free
Exclusive to our clients, with no licence or subscription fee

Features as described in the BOM Studio feature guide v4.4 (October 2026).

One source of truth, from the 3D model to the last bolt on site

Why We Built It

One source of truth, from the 3D model to the last bolt on site

Most project problems start when information is copied: a quantity retyped from a drawing into a spreadsheet, a packing list that no longer matches the model, a status update sent by email that is already out of date.

BOM Studio removes the copying. The approved Tekla model of your building is read once, and every department works from the same data: engineering, purchasing, production, quality control, logistics and the site. Sales, the project manager, QA/QC and your own team look at one project record, with one ID and one QR code for each member.

What this means for you

  • Quantities, weights and documents that always match each other
  • Progress you can check yourself, at any time, without asking
  • Quality records that show who did what, when and to which standard
  • Containers you can check against their packing lists on arrival
  • A complete digital record of your building at handover

Performed directly by World Steel

The Platform

Inside BOM Studio

Real screens from the platform, shown with World Steel's demo project. Select a stage to see what you can follow.

Weekly production report, desktop and phone
Real-time production reports, second view

Real-time production reports

Progress is measured by steel weight, stage by stage, and updated the moment the factory confirms a step. Your weekly report opens from a secure link, on a computer or a phone, with no login.

  • Progress by tonnage for every stage
  • Factory photographs sorted by stage and date
  • English or Vietnamese at one click
Real-time production reports

Screens use World Steel's demo project (WSC-DEMO-0726).

Your project in BOM Studio, from contract to handover

What is recorded at each stage, and what you can see.

  1. 01

    Quotation & contract

    Your project record is opened: status from quotation through contract to warranty, fabrication standard, surface protection, contract tonnage, delivery date and your World Steel team (Sales, project manager, design engineer, QA/QC).

    Technical highlight: One record used by every document.

    Related documents: Project page with QR code

  2. 02

    Engineering

    The approved Tekla model is read into BOM Studio: every assembly, part, bolt and weld, with drawings attached to the right piece mark. Model errors are flagged before purchasing starts.

    Technical highlight: 3D model viewable in any browser.

    Related documents: Bill of materials, 3D model

  3. 03

    Production

    Each member is tracked stage by stage and progress is measured by steel weight. The factory confirms each step by scanning the member's QR label.

    Technical highlight: Live progress, coloured 3D model, photographs.

    Related documents: Live progress page, weekly reports

  4. 04

    Quality control

    Inspection steps and hold points are part of the route. Only a QC inspector can record PASS or FAIL, and non-conformances are tracked to closure.

    Technical highlight: Finished does not mean passed.

    Related documents: Inspection and weld traceability records

  5. 05

    Packing & loading

    Only QC-released members can be packed. Packages are scanned into containers to a checked load plan, sealed and released as a locked document.

    Technical highlight: Packed in erection order.

    Related documents: Client packing list, container packing report

  6. 06

    Shipping

    Every package carries an international shipping mark with a QR code that opens the project's electronic file.

    Technical highlight: Documents and photographs ready before arrival.

    Related documents: Shipping marks, document status

  7. 07

    Site receiving

    Your site team checks the seal and scans each package on arrival, recording any shortage or damage with photographs.

    Technical highlight: Nothing is received automatically.

    Related documents: Receiving record

  8. 08

    Erection

    Your erection contractor uses the site app: component passport, navigation in the model, erection sequence, 4D plan vs actual and 11 types of inspection.

    Technical highlight: Works offline on site.

    Related documents: Erection dashboard and inspections

  9. 09

    Handover

    The handover package is generated from the record: register, progress, inspections, NCRs, drawings, logistics and photographs.

    Technical highlight: Locked with a SHA-256 manifest.

    Related documents: Digital handover package

Client Access

What you can see as a client

Free and exclusive to World Steel clients: the views of BOM Studio shared with you and your team.

Project page by QR code

An overview of your project, production progress, the latest photographs and direct contact with your Sales and project manager.

Production reports by link

Weekly or monthly reports from a signed link that opens only your project and that period, with no login.

Client packing lists

Released packing lists with a QR code on every package, with internal information removed.

Container packing reports

One report per container: container condition, VGM, seal, packing list, photographs and video of the loading.

Free Smart Erection access

For you and your local erection contractor: invited accounts and share links with a scope, an expiry date and a PIN, plus a site app that works offline.

Digital handover

Reports and records of your building, generated from the data and locked with a verification manifest.

Standards built into BOM Studio's checklists and records

The standards that apply to your project are set out in your contract and Inspection and Test Plan.

StandardUsed in BOM Studio for
EN 1090-2 · ISO 3834 · AS/NZS 5131Production traceability, QC records, welding procedures and welder qualifications
ISO 5817 · AWS D1.1 · AS/NZS 1554.1Weld inspection criteria in the QA/QC route
EN 10204 3.1Material certificates that travel with the shipment
ISO 6346Container numbers, check digits and size-type codes
SOLAS Chapter VI, Regulation 2Verified gross mass (VGM) of each container
ISO 17712 · CTU Code · ISPM 15Container seals, packing and securing, wood packaging
UN/ECE Recommendation 15 · ISO 780Shipping marks and handling symbols
C-TPAT / WCO SAFESeven-point container inspection before loading

World Steel's certifications are listed on our Quality Assurance page.

FAQ

BOM Studio: questions

Straight answers on scope, design codes, shipping and what happens in Guyana.

Ask an engineer
Will my team be shown how to use it?

Yes. World Steel gives your team a live demo of BOM Studio and guidance on using it, so everyone knows where to find progress, documents and site tools from the start of the project.

Does BOM Studio cost extra?

No. BOM Studio is a service exclusively for World Steel clients and is completely free. There is no licence, subscription or per-user fee.

Do I need to install any software?

No. BOM Studio runs in a web browser, including the 3D model. Your site team can also use the site app on a phone or tablet, and it keeps working without a connection and synchronises when the connection returns.

Is the progress really live?

Yes. Progress is updated as soon as the factory confirms a step by scanning a member's QR label, and it is measured by steel weight, not by the number of lines in a list. The project page and the report link always show the status at the moment you open them.

Who can see my project?

Only the people we invite to your project, and people you share a link with. Share links have a defined scope, an expiry date and a PIN, and can be revoked. Documents for clients never show internal information such as user names, internal notes or prices.

Can my erection contractor use BOM Studio?

Yes, free of charge. Every World Steel client and their local erection contractor get free access to Smart Erection. Your contractor can be invited with a role, such as site manager, installation supervisor or QC inspector, and use the site app to receive packages, find members, follow the erection sequence and record inspections.

What happens if the design changes?

A new model revision is read into BOM Studio. Component IDs and installation data are kept, and every released document keeps its revision history.

In which languages are documents available?

The client views are available in English. Packing lists, shipping marks and container packing reports can be issued in 19 languages; machine translations are reviewed before they are sent to you.

How is my data protected?

Permissions are checked on the server for every page and action, QR codes carry no data or access rights, records are append-only, and released documents are locked with a SHA-256 hash.

Book a Live BOM Studio Demo

Tell us about your project. We will give you a live demo of BOM Studio, show how your steel would be tracked from production to handover, and guide your team on using it.

Your details
Project information

We usually respond within two business days (Vietnam time, GMT+7). Your information is never sold or shared for marketing by third parties.