BOM Studio · Risk

Project Risk Control: Every Risk Has a Check, a Rule and a Record

Buying a steel building from overseas means trusting a factory you cannot visit every day. BOM Studio replaces that trust with evidence. Each risk that can delay or damage your project is controlled by a check in the system, and every check leaves a record you can see.

Tay Ninh, Vietnam Engineering · Fabrication · Shipping Destination: Guyana

Project risks and how BOM Studio controls them

From design to handover.

RiskHow BOM Studio controls itThe record you can see
Model errors reach purchasing and the factoryThe model is checked on import: outdated numbering, duplicate marks with different members, wrong materialsModel warnings resolved before release
Wrong quantities or weightsOne data set for the BOM, purchasing, production and packing; totals always agreeBOM and Excel exports from the model
Wrong drawing revision in the factoryDrawings and fabrication files are attached to the right mark automaticallyDrawing register by mark
Delays you only hear about lateProgress measured by weight and updated when each step is scannedLive progress page and weekly reports
Defects passed as finishedInspections in the route, hold points, PASS / FAIL by QC onlyInspection records and NCRs
Unqualified weldingOnly authorised welders with valid certificates and approved procedures can report weldingWeld traceability by welder and WPS
Members with open problems shippedOnly QC-released, painted members without open NCRs can be packedEligibility check at packing
Missing or wrong members in containersQR scan packing, serial control, no member packed twiceReleased packing list and package QR codes
Containers loaded badlyLoad plans checked for clearances, payload, centre of gravity and stackingApproved load plan and loading photographs
Documents changed after shipmentReleased packing lists and handover packages locked with SHA-256; amendments need a reason and approvalVerification line and amendment log
Shortages or damage on arrivalSeal check and package scanning at receiving, with photographsReceiving record and discrepancies
Members arriving in the wrong orderPacking by erection zone and sequence, early-needed members flaggedContainer to erection report
Erection on unapproved drawingsMembers with unapproved drawings placed on DRAWING HOLDDrawing register and holds
Incomplete records at handoverHandover generated from the data, by zone or finalHandover package with manifest

Principles

Principles behind the controls

Applied to every part of BOM Studio.

Permissions checked on the server

Every page and action is checked on the server by project, department and role. Hiding a button is never the only protection.

QR codes carry no access

A QR code carries only a signed reference. It holds no password, token or data, and a forged code is rejected.

Separation of duties

Production cannot approve QC, site updates cannot accept their own work, and approving packing lists is a separate permission.

History is never overwritten

Reports, inspections, scans and corrections are append-only, with old and new values, who and why.

Released means locked

Released packing lists, approved weld revisions and handover packages are locked snapshots with SHA-256.

Only released data goes out

Client links and QR codes show only released documents and published photographs, never internal notes, QC details or prices.

Discuss the Risks of Your Project

Tell us about your project and your concerns. We will show you how each one would be controlled and reported.

Your details
Project information

We usually respond within two business days (Vietnam time, GMT+7). Your information is never sold or shared for marketing by third parties.

More from BOM Studio

BOM Studio: World Steel Technology

World Steel's own project platform. Every steel member has an ID and QR code, and every step from production to handover is recorded, so you can follow your pr…

Read more

Real-Time Production Reports

Follow the fabrication of your building live: progress by steel weight for every stage, a coloured 3D model, factory photographs and weekly reports from a secu…

Read more

Real-Time Quality Control

Every inspection recorded as it happens: hold points, PASS / FAIL by a QC inspector, NCRs tracked to closure, welder qualifications checked by the system and f…

Read more

Packing, Containers & Shipping Documents

QR scan packing of QC-released members, checked container load plans, locked packing lists, a QR code on every package and a full report for every container.

Read more

Smart Erection

Traceability that continues on site: component passports by QR code, model navigation, erection sequence, 4D progress, site inspections and an offline site app…

Read more

Digital Handover

A complete, verifiable record of your building, generated from the project data and locked with a SHA-256 manifest.

Read more

For Project Owners & Investors

For project owners and investors in Guyana: buy your steel structure directly from the manufacturer, without intermediary margins, with engineers from day one …

Read more

Export Process & Packing Control

Every member inspected, marked, listed, packed, loaded and photographed: how World Steel makes sure your project in Guyana receives exactly what was designed, …

Read more

Shipping Lines & Transit Times: Vietnam to Guyana

The international shipping lines, routes and transshipment hubs that connect Vietnam with Georgetown, the weekly sailing rhythm, a realistic 45–60 day transit …

Read more